Skip to main content

Table 5 Signal follow-up completeness by surveillance type

From: Evaluation of a multi-component early warning system for pastoralist populations in Doolo zone, Ethiopia: mixed-methods study

Surveillance type

Total number of signals

Number of Signals in EWAR database after pre-verification

Number of Signals with follow-up completed1

Percent of signals entered into EWAR database after pre-verification

Percent of signals with follow-up completed, of total

Percent of signals with follow-up completed, of those entered into EWAR database

CEBS

916

199

150

22

16

75

OEBS

62

62

48

100

77

77

CIBS

32

4

3

13

9

75

Total

1010

265

201

26

20

76

  1. 1Follow-up completed means that a signal went through all relevant processing steps from verification, risk assessment and response, as appropriate