Intervention components | Ethiopia | DRC | Bangladesh |
---|---|---|---|
Target population sizea | 2000 households (10,000 individuals) | 1000 households (5000 individuals) | 5000 households (25,000 individuals) |
Duration of training provided to implementation staff about the OHS | 1Â h | 1Â day | 1Â day |
Number of staff trained on the OHS | 2 | 35 | 85 |
Number of OHS facilities | 509 | 511 | 948 |
Location of OHS | |||
 Public spaces (markets, water points, communal spaces) | 62 (12%) | 287 (56%) | 105 (11%) |
 Outside a household or shared latrine | 394 (77%) | 143 (28%) | 757 (78%) |
 Institutional settings (e.g. situated outside a health centre, school, youth centre, religious building, distribution site or organisation offices) | 44 (9%) | 16 (3%) | 86 (9%) |
 Unspecified | 9 (2%) | 64 (13%) | 0 (0%) |
Duration of installation—average (range) | 22 min (5–44 min) | 55 min (30–60 min) | 30 min (15–40 min) |
Anticipated number of OHS users per facility—average (range) | 17 (1—700) | 224 (55 -1928) | 52 (5—165) |
Post installation steps | |||
 Height was adjusted | 154 (30%) | 511 (100%) | 848 (89%) |
 Soak away pit dug | 172 (34%) | 511 (100%) | 226 (24%) |
 Footsteps to the facility installed | 26 (5%) | 174 (34%) | 6 (0.6%) |
 IEC materials placed on the OHS | 475 (93%) | 511 (100%) | 942 (99%) |
 Padlocks provided | 509 (100%) | 497 (97%) | 948 (100%) |
 Soap (detergent) provided | 509 (100%) | 499 (97%) | 948 (100%) |
 Number of facilities where all the above steps were complete | 0 (0%) | 172 (34%) | 0 (0%) |
Duration of training provided to implementation staff on MMH | 2Â h | 2.5Â h | 5Â h |
Number of implementation staff trained on MMH | 7 | 5 | 2 |
Number of community volunteers trained on MMH | 102 | 20 | 11 |
Total number of people involved in MMH activities (attending at least one session) | 951 | 2578 | 334 |
Total number of MMH activities delivered in each country (See Additional file 2 for more details) | 10 | 9 | 12 |